Facilities Outages

Views Navigation

Event Views Navigation

Events

Today
  • Chauvenet HVAC Preventive Maintenance November 11 – 13, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: September 30, 2026

    To: Chauvenet Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: November 11 - 13, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors
    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Labriola 117 Replacement of Exhaust Fan November 13, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: November 10, 2026

    To: Labriola
    From: David Klug - Office of Design and Construction
    Emergency Contact Info: 512-914-9640

    Outage Date: November 13, 2026
    Outage Time: 7:00AM – 3:00PM
    Purpose: Replacement of exhaust fan

    System(s) Involved: Paint booth

    Effect(s) on Occupants: There will be workers in Labriola 117 on Friday, 11/13 working on elevated platforms with heavy equipment replacing the exhaust fan that serves the Paint booth. Intermittent or partial use of 117 may be expected towards the end of the day.

    Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call Dave Klug at David.klug@mines.edu or 512-914-9640.

    Thank you for your cooperation.

  • Green Center HVAC Preventive Maintenance November 16 – 18, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: September 30, 2026

    To: Green Center Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: November 16 - 18, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Alley West of Illinois St. between 17th & 18th Streets Closure November 17 – 20, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: November 6, 2026

    To: Writing Center, McBride Honors, WISEM House, President’s Residence, Maple Hall
    From: Office of Design & Construction
    Emergency Contact Info: Kathy Burris

    Outage Date: November 17 – 20, 2026
    Outage Time: All Day
    Purpose: Alley Closure - Xcel to restore asphalt and concrete in alley west of Illinois St. between 17th & 18th Streets, due to emergency gas repair.

    System(s) Involved: Asphalt and concrete restoration.

    Effect(s) on Occupants: Closure of alley, unavailable to through traffic. Pedestrian traffic will not be allowed during this closure.

    Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call Kathy Burris at 720-272-3875.

    Thank you for your cooperation.

  • Green Center HVAC Preventive Maintenance November 16 – 18, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: September 30, 2026

    To: Green Center Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: November 16 - 18, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Alley West of Illinois St. between 17th & 18th Streets Closure November 17 – 20, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: November 6, 2026

    To: Writing Center, McBride Honors, WISEM House, President’s Residence, Maple Hall
    From: Office of Design & Construction
    Emergency Contact Info: Kathy Burris

    Outage Date: November 17 – 20, 2026
    Outage Time: All Day
    Purpose: Alley Closure - Xcel to restore asphalt and concrete in alley west of Illinois St. between 17th & 18th Streets, due to emergency gas repair.

    System(s) Involved: Asphalt and concrete restoration.

    Effect(s) on Occupants: Closure of alley, unavailable to through traffic. Pedestrian traffic will not be allowed during this closure.

    Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call Kathy Burris at 720-272-3875.

    Thank you for your cooperation.

  • Green Center HVAC Preventive Maintenance November 16 – 18, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: September 30, 2026

    To: Green Center Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: November 16 - 18, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Wellness Center Occupants HVAC Preventive Maintenance November 18 – 19, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: September 30, 2026

    To: Wellness Center Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: November 18 - 19, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Alley West of Illinois St. between 17th & 18th Streets Closure November 17 – 20, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: November 6, 2026

    To: Writing Center, McBride Honors, WISEM House, President’s Residence, Maple Hall
    From: Office of Design & Construction
    Emergency Contact Info: Kathy Burris

    Outage Date: November 17 – 20, 2026
    Outage Time: All Day
    Purpose: Alley Closure - Xcel to restore asphalt and concrete in alley west of Illinois St. between 17th & 18th Streets, due to emergency gas repair.

    System(s) Involved: Asphalt and concrete restoration.

    Effect(s) on Occupants: Closure of alley, unavailable to through traffic. Pedestrian traffic will not be allowed during this closure.

    Please notify all personnel affected by this outage. If this interruption of service creates an unmanageable problem, or you desire additional information, please call Kathy Burris at 720-272-3875.

    Thank you for your cooperation.

  • Engineering Annex HVAC Preventive Maintenance November 19 – 20 , 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: September 22, 2026

    To: Engineering Annex Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: November 19 – 20 , 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Early Childhood Center HVAC Preventive Maintenance November 19 – 20, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: September 30, 2026

    To: Early Childhood Center Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: November 19 - 20, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Wellness Center Occupants HVAC Preventive Maintenance November 18 – 19, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: September 30, 2026

    To: Wellness Center Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: November 18 - 19, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.