  • Thomas Hall HVAC Preventive Maintenance December 3, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: Thomas Hall Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 3, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • USGS HVAC Preventive Maintenance December 1 – 3, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: USGS Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 1 - 3, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Alderson Hall HVAC Preventive Maintenance December 7 – 10, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: Alderson Hall Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 7 - 10, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Alderson Hall HVAC Preventive Maintenance December 7 – 10, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: Alderson Hall Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 7 - 10, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Alderson Hall HVAC Preventive Maintenance December 7 – 10, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: Alderson Hall Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 7 - 10, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Alderson Hall HVAC Preventive Maintenance December 7 – 10, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: Alderson Hall Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 7 - 10, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Moly HVAC Preventive Maintenance December 10, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: Moly Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 10, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Unit Operations HVAC Preventive Maintenance December 10, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: Unit Operations Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 10, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • East Classroom HVAC Preventive Maintenance December 14 – 15, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: East Classroom Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 14 - 15, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • East Classroom HVAC Preventive Maintenance December 14 – 15, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: East Classroom Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 14 - 15, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • Beck Venture Center HVAC Preventive Maintenance December 15 – 16, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: Beck Venture Center Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 15 - 16, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating, and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.

  • 607 19th Street HVAC Preventive Maintenance December 16, 2026

    EMERGENCY / SERVICE OUTAGE MEMORANDUM
    Notification Date: October 30, 2026

    To: 607 19th Street Occupants
    From: Roberto Velazquez
    Emergency Contact Info: 303-273-3238

    Outage Date: December 16, 2026
    Outage Time: 5:30am - 3:30pm daily, (Critical Equipment, Air Handling units (AHUs), Roof Top Units (RTUs), and Exhaust Systems, will be serviced from 5:30am to 10:00am or sooner if possible.)
    Purpose: HVAC Preventive Maintenance

    System(s) Involved: Air handling units, Roof Top Units, FCU’s, Exhaust Fans, and air compressors

    Effects on Occupants: Personnel may remain in the building during HVAC preventive maintenance. You may experience a slight change in temperature throughout the building. The air handlers provide ventilation air, make-up air, and primary heating and cooling for the building. During the shutdown period, there will be no air circulation, heating and cooling setpoints will not be maintained, and affected spaces will not achieve the required static pressure (spaces may become more negative). Intermittent lab fume hood airflow may also occur during this period.

    Scope of Work: Maintenance activities will include replacing belts and filters, cleaning coils and outside air intakes, greasing fan, and motor bearings, and inspecting all major components of the HVAC equipment. To minimize operational disruption, all equipment will be serviced early in the morning, and units will be taken offline and serviced one at a time, ensuring that only a single system is out of service at any given time.

    Comments: Please notify all personnel affected by this outage. If this interruption creates an unmanageable issue or if additional information is needed, please contact me at 303-273-3238.

    Thank you for your cooperation.